Skip to content
Cement plant in continuous operation
Knergy · Sustainable Energy

Hydrogen for heavy industry.Engineered for industrial decarbonization.

Specialized hydrogen technology to decarbonize the hardest industries to transform: cement, steel and thermal processes. Engineered from inside heavy industry, with continuous 24/7 operation.

Operating coverage: México · USA · Ecuador · LATAM · Europe · Asia · Africa

HHO

H₂O, water molecule

Exclusive Guide

The Future of Hydrogen in the Cement Industry

The exclusive guide for cement groups evaluating hydrogen — what to assess before you invest, and the critical factors for stable 24/7 operation.

Read the guide
Inside the guide

Are all hydrogen technologies the same?

What you should evaluate before investing in a hydrogen plant for cement. The critical factors to ensure stable 24/7 operation.

See what's inside

The Knergy promise in 4 numbers

30–70
kcal/kg less

Reduction in the kiln's specific heat consumption.

300
Nm³/h of H₂

Nominal capacity of one Hydrobooster HB300 skid.

SIL2/SIL3
Functional safety

Architecture designed to IEC 62061; manufacturer-certified ATEX/IECEx components.

96%
Uptime

Guaranteed 24/7 availability.

The problem we solve

Profitable decarbonization from day one

Heavy industry — cement, steel, glass, lime, paper — accounts for over 25% of global CO₂ emissions and faces unprecedented simultaneous pressure: stricter carbon regulations, volatile fossil fuel costs, and growing demand. Existing solutions (capture and storage, full electrification, 100% alternative fuels) have 10 to 20 year implementation horizons and prohibitive CAPEX.

Knergy offers a decarbonization path that is profitable from day one: controlled injection of green hydrogen and oxygen into continuous combustion processes, without modifying the production line, with a return on investment under four years.

Turn your plant into your most profitable asset

Ready to turn your plant into the most profitable asset in your portfolio?

Receive a preliminary techno-economic assessment of your plant within 5 business days, with no commitment.

Quote your plant